{"id":79750,"date":"2016-08-09T11:37:30","date_gmt":"2016-08-09T11:37:30","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=79750"},"modified":"2016-08-09T11:37:30","modified_gmt":"2016-08-09T11:37:30","slug":"jayalalithaa-announces-rs-4126-crore-worth-schemes-in-energy-sector","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/jayalalithaa-announces-rs-4126-crore-worth-schemes-in-energy-sector\/","title":{"rendered":"Jayalalithaa announces Rs 4126 crore worth schemes in energy sector"},"content":{"rendered":"<p>Tamil Nadu Chief Minister J Jayalalithaa on Tuesday announced Rs 4126 crore worth schemes in the energy sector, including setting up of a 2&#215;1500 MVA sub-station in Virudhunagar to transmit power generated from a 1600 mw power plant coming up in Ramanathapuram.<\/p>\n<p>Making a suo motu statement in the Tamil Nadu Assembly, Jayalalithaa said works at the 2&#215;800 mw thermal power station at Uppur in Ramanathapuram were underway and scheduled to be completed in 2020.<\/p>\n<p>&#8220;To transmit the electricity generated from this power station to rest of Tamil Nadu, a 2&#215;1500 MVA, 765\/400 kilovolt sub-station will be constructed at Virudhunagar at a cost of about Rs 2000 crore,&#8221; she said.<\/p>\n<p>Further, steps will be taken to transmit the power generated from the second and third sections of Udankudi thermal power station to other parts of the state through this sub-station, she said.<\/p>\n<p>Also, 400 kv sub-stations covering solar and wind power units at Kayatharu, Kamuthi and Thappagundu will be connected with the Virudhunagar sub-station, she added.<\/p>\n<p>The 765 kv each Ariyalur and Coimbatore sub-stations will also be linked with the proposed Virudhunagar sub-station, the CM said.<\/p>\n<p>Further, Jayalalithaa announced Rs 80 crore towards the upgradation and modernisation of the Kodayar Hydel power station, which has been in operation since 1970.<\/p>\n<p>Its installed capacity will be enhanced to 70 mw from the existing 60 mw, while steps will be taken to expand its lifespan to another 25 years, she added.<\/p>\n<p>While the lifespan of a hydel power station was 35 years, it has already served for over 45 years, she noted.<\/p>\n<p>Further, Jayalalithaa announced allocating Rs 1750 crore to replace over 17,500 existing transformers in Chennai and its surroundings with the more safe Ring Main Units.<\/p>\n<p>Besides, 38,000 pillar boxes in Chennai and its suburbs will be replaced with better quality six-way pillar boxes at cost of Rs 270 crore, she added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tamil Nadu Chief Minister J Jayalalithaa on Tuesday announced Rs 4126 crore worth schemes in the energy sector, including setting up of a 2&#215;1500 MVA sub-station in Virudhunagar to transmit power generated from a 1600 mw power plant coming up in Ramanathapuram. Making a suo motu statement in the Tamil Nadu Assembly, Jayalalithaa said works at the 2&#215;800 mw thermal power station at Uppur in Ramanathapuram were underway and scheduled to be completed in 2020. &#8220;To transmit the electricity generated from this power station to rest of Tamil Nadu, a 2&#215;1500 MVA, 765\/400 kilovolt sub-station will be constructed at Virudhunagar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-79750","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/79750","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=79750"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/79750\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=79750"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=79750"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=79750"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}