{"id":69142,"date":"2016-05-26T11:48:18","date_gmt":"2016-05-26T11:48:18","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=69142"},"modified":"2016-05-26T11:48:18","modified_gmt":"2016-05-26T11:48:18","slug":"gail-reconfigures-rs-12000-cr-jagdishpur-haldia-gas-pipeline","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/gail-reconfigures-rs-12000-cr-jagdishpur-haldia-gas-pipeline\/","title":{"rendered":"GAIL reconfigures Rs 12,000 cr Jagdishpur-Haldia gas pipeline"},"content":{"rendered":"<p>Country&#8217;s biggest natural gas transporter GAIL India Ltd has reconfigured the Rs 12,000 crore Jagdishpur-Haldia pipeline, which will connect Prime Minister Narendra Modi&#8217;s political constituency Varanasi to the gas grid, to link the Dhamra terminal.<\/p>\n<p>The over 2,500-kilometer line will be constructed in three phases and will also now connect Adani Group&#8217;s Dhamra LNG import terminal in Odisha, GAIL Chairman and Managing Director B C Tripathi said here.<\/p>\n<p>In the first phase, a trunk pipeline from Phulpur (Allahabad) will be laid to Dobhi (Gaya) in Bihar with spur lines to Barauni and Patna. &#8220;The 755-km Phase-1 project will cost Rs 3,200 crore and will be completed by December 2018,&#8221; he said.<\/p>\n<p>This section will take natural gas to Varanasi for not just feeding local industries but also for retailing CNG to automobiles and piped cooking gas for households.<\/p>\n<p>GAIL already as a line up to Phulpur. It is raising capacity of this pipeline by laying a 672-km parallel line from Vijaipur in Madhya Pradesh to Phulpur via Auriaya in Uttar Pradesh at the cost of Rs 4,300 crore.<\/p>\n<p>In the Phase-II, a 1200-km line would be laid from Dobhi to Bokaro\/Ranchi in Jharkhand and Angul and Dharma in Odisha at the cost of Rs 5,565 crore, he said, adding that Phase-III will involve laying 583-km line to Haldia at the cost of Rs 3,425 crore.<\/p>\n<p>&#8220;While we can confirm that Phase-1 will be completed by December 2018, Phase-II and III completion will depend on the fertiliser plants coming up in the region as well as the timing of the Dharma LNG terminal,&#8221; he said.<\/p>\n<p>The phase-1 project will supply gas to major industries such as the Barauni Refinery and the Barauni fertilizer plant, which is being revived, besides power and steel plants.<\/p>\n<p>It will also help in setting up of City Gas Networks in major cities enroute.<\/p>\n<p>Previously, Jagdishpur-Haldia pipeline was to span over 2,050-km but the length has now been increased with addition of Dharma port connectivity.<\/p>\n<p>GAIL originally proposed to lay the pipeline from Jagdishpur in Uttar Pradesh to Haldia in West Bengal nearly a decade back. But the project was put on the back burner due to non availability of gas and customers.<\/p>\n<p>The project was revived after BJP government came to power in May 2014 and it was felt that Modi&#8217;s constituency, Varanasi should be connected to the gas grid at the earliest.<\/p>\n<p>Also, the pipeline was needed for revival the fertiliser units in Barauni in Bihar and Gorakhpur in Uttar Pradesh.<\/p>\n<p>Tripathi said GAIL is also investing Rs 2,000 crore in replacing old pipelines in Cauvery and Krishna Godavari area of Andhra Pradesh and Tamil Nadu as well as in Gujarat.<\/p>\n<p>&#8220;We are laying 700-km of new pipeline to replaced 35-40 years old pipelines,&#8221; he said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Country&#8217;s biggest natural gas transporter GAIL India Ltd has reconfigured the Rs 12,000 crore Jagdishpur-Haldia pipeline, which will connect Prime Minister Narendra Modi&#8217;s political constituency Varanasi to the gas grid, to link the Dhamra terminal. The over 2,500-kilometer line will be constructed in three phases and will also now connect Adani Group&#8217;s Dhamra LNG import terminal in Odisha, GAIL Chairman and Managing Director B C Tripathi said here. In the first phase, a trunk pipeline from Phulpur (Allahabad) will be laid to Dobhi (Gaya) in Bihar with spur lines to Barauni and Patna. &#8220;The 755-km Phase-1 project will cost Rs [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[133],"tags":[],"class_list":["post-69142","post","type-post","status-publish","format-standard","hentry","category-oil-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/69142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=69142"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/69142\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=69142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=69142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=69142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}