{"id":654566,"date":"2025-12-01T11:44:36","date_gmt":"2025-12-01T06:14:36","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=654566"},"modified":"2025-12-01T11:44:36","modified_gmt":"2025-12-01T06:14:36","slug":"hindustan-power-to-expand-clean-energy-footprint-with-150-mw-solar-project-says-chairman-ratul-puri","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/hindustan-power-to-expand-clean-energy-footprint-with-150-mw-solar-project-says-chairman-ratul-puri\/","title":{"rendered":"Hindustan Power to expand clean-energy footprint with 150 MW solar project, says Chairman Ratul Puri"},"content":{"rendered":"<p>Hindustan Power, an integrated energy company in India, has won a bid from the Solar Energy Corporation of India (SECI) to develop a solar and battery energy storage project with a contracted capacity of 150 MW of solar power. The project will require the installation of approximately 300 MWp of solar capacity and 300 MWh of Battery Energy Storage Systems (BESS). Shaping India\u2019s next phase of clean-energy development, Chairman Ratul Puri emphasied the company\u2019s focus on building flexible, storage-led renewable assets aligned with the country\u2019s evolving power infrastructure.<\/p>\n<p>The project will be developed under the \u2018SECI\u2013ISTS\u2013XX\u2019 tender. It is designed for flexible deployment and can be set up at suitable locations across India. It was secured through a tariff-based competitive bidding process, followed by a Reverse Auction (e-RA) conducted on the ETS portal. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hindustan Power, an integrated energy company in India, has won a bid from the Solar Energy Corporation of India (SECI) to develop a solar and battery energy storage project with a contracted capacity of 150 MW of solar power. The project will require the installation of approximately 300 MWp of solar capacity and 300 MWh of Battery Energy Storage Systems (BESS). Shaping India\u2019s next phase of clean-energy development, Chairman Ratul Puri emphasied the company\u2019s focus on building flexible, storage-led renewable assets aligned with the country\u2019s evolving power infrastructure. The project will be developed under the \u2018SECI\u2013ISTS\u2013XX\u2019 tender. It is designed [&hellip;]<\/p>\n","protected":false},"author":44,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[139,130,237],"tags":[],"class_list":["post-654566","post","type-post","status-publish","format-standard","hentry","category-live-mint","category-newspapers","category-power-live-mint"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/654566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=654566"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/654566\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=654566"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=654566"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=654566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}