{"id":652893,"date":"2025-11-18T08:29:13","date_gmt":"2025-11-18T02:59:13","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=652893"},"modified":"2025-11-18T08:54:29","modified_gmt":"2025-11-18T03:24:29","slug":"tata-power-renewable-energy-commissions-nhpcs-300-mw-solar-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/tata-power-renewable-energy-commissions-nhpcs-300-mw-solar-project\/","title":{"rendered":"Tata Power Renewable Energy commissions NHPC&#8217;s 300 MW solar project"},"content":{"rendered":"<p>New Delhi: Tata Power Renewable Energy Ltd (TPREL) on Monday said it has commissioned NHPC&#8217;s 300 MW solar project as part of an EPC contract.<\/p>\n<p>A subsidiary of Tata Power, TPREL is a developer of renewable energy projects (including solar, wind, hybrid, round-the-clock, peak, floating solar, and storage systems like battery storage).<\/p>\n<p>In a statement, TPREL said it &#8220;has successfully commissioned NHPC&#8217;s 450 MWp (DC)\/300 MW (AC) solar power project as the EPC contractor at Karnisar Bhatiyan, Bikaner, Rajasthan&#8221;.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>New Delhi: Tata Power Renewable Energy Ltd (TPREL) on Monday said it has commissioned NHPC&#8217;s 300 MW solar project as part of an EPC contract. A subsidiary of Tata Power, TPREL is a developer of renewable energy projects (including solar, wind, hybrid, round-the-clock, peak, floating solar, and storage systems like battery storage). In a statement, TPREL said it &#8220;has successfully commissioned NHPC&#8217;s 450 MWp (DC)\/300 MW (AC) solar power project as the EPC contractor at Karnisar Bhatiyan, Bikaner, Rajasthan&#8221;.<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-652893","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/652893","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=652893"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/652893\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=652893"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=652893"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=652893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}