{"id":643531,"date":"2024-05-06T10:04:06","date_gmt":"2024-05-06T04:34:06","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=643531"},"modified":"2024-05-06T10:20:34","modified_gmt":"2024-05-06T04:50:34","slug":"tata-power-renewable-signs-pact-with-sjvn-for-460-mw-clean-energy-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/tata-power-renewable-signs-pact-with-sjvn-for-460-mw-clean-energy-project\/","title":{"rendered":"Tata Power Renewable signs pact with SJVN for 460 MW clean energy project"},"content":{"rendered":"<p>Tata Power Renewable Energy Ltd (TPREL) on Saturday said it has signed an agreement with state-owned SJVN Ltd to set up a 460 MW Firm and Dispatchable Renewable Energy (FDRE) project. <\/p>\n<p>An FDRE plant enables round-the-clock power supply, assisting power distribution companies (discoms) in fulfilling their Renewable Purchase Obligations (RPOs) and Energy Storage Obligations (ESOs). <\/p>\n<p>&#8220;The plant, designed to meet the 460 MW FDRE requirement, integrates solar, wind, and battery storage technologies to ensure efficient energy dispatch during peak hours, thereby stabilizing the grid,&#8221; it said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tata Power Renewable Energy Ltd (TPREL) on Saturday said it has signed an agreement with state-owned SJVN Ltd to set up a 460 MW Firm and Dispatchable Renewable Energy (FDRE) project. An FDRE plant enables round-the-clock power supply, assisting power distribution companies (discoms) in fulfilling their Renewable Purchase Obligations (RPOs) and Energy Storage Obligations (ESOs). &#8220;The plant, designed to meet the 460 MW FDRE requirement, integrates solar, wind, and battery storage technologies to ensure efficient energy dispatch during peak hours, thereby stabilizing the grid,&#8221; it said.<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-643531","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/643531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=643531"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/643531\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=643531"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=643531"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=643531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}