{"id":640643,"date":"2024-04-02T10:24:41","date_gmt":"2024-04-02T04:54:41","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=640643"},"modified":"2024-04-04T10:22:12","modified_gmt":"2024-04-04T04:52:12","slug":"ntpc-wins-3445-mw-renewable-energy-projects-in-total-during-fy24","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/ntpc-wins-3445-mw-renewable-energy-projects-in-total-during-fy24\/","title":{"rendered":"NTPC wins 3,445 MW renewable energy projects in total during FY24"},"content":{"rendered":"<p>State-owned power giant NTPC on Monday said it has won 3,445 MW of renewable energy (RE) projects in the fiscal year ending March 31, 2024. <\/p>\n<p>&#8220;NTPC wins 3,445 MW RE bids in FY 2023-24. This records 58 per cent of total RE tenders the company participated during the financial year which is the highest since it started participating in the bids,&#8221; the company said. <\/p>\n<p>Currently, NTPC has 3.5 GW of RE operational capacity with over 20 GW (gigawatt) in the pipeline. <\/p>\n<p>NTPC Ltd, under the Ministry of Power, is the country&#8217;s largest integrated power utility having 76 GW installed capacity that contributes 25 per cent of total electricity demand in India.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-owned power giant NTPC on Monday said it has won 3,445 MW of renewable energy (RE) projects in the fiscal year ending March 31, 2024. &#8220;NTPC wins 3,445 MW RE bids in FY 2023-24. This records 58 per cent of total RE tenders the company participated during the financial year which is the highest since it started participating in the bids,&#8221; the company said. Currently, NTPC has 3.5 GW of RE operational capacity with over 20 GW (gigawatt) in the pipeline. NTPC Ltd, under the Ministry of Power, is the country&#8217;s largest integrated power utility having 76 GW installed capacity [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-640643","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/640643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=640643"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/640643\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=640643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=640643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=640643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}