{"id":640267,"date":"2024-04-01T10:16:21","date_gmt":"2024-04-01T04:46:21","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=640267"},"modified":"2024-04-01T11:49:08","modified_gmt":"2024-04-01T06:19:08","slug":"ntpc-shuts-down-operations-of-220-mw-barauni-stage-i-project-permanently","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/ntpc-shuts-down-operations-of-220-mw-barauni-stage-i-project-permanently\/","title":{"rendered":"NTPC shuts down operations of 220 MW Barauni Stage-I project permanently"},"content":{"rendered":"<p>State-owned power giant NTPC has closed down its Barauni Thermal Power Station Stage-I of 220 MW permanently. <\/p>\n<p>NTPC is India&#8217;s largest power utility with a total installed capacity of 75,418 MW (including JVs), according to its official website. <\/p>\n<p>&#8220;Operation of NTPC Barauni Thermal Power Station Stage-I (2&#215;110 MW) comprising of two Units (Unit 6 &amp; 7) of 110 MW each (along with all Auxiliary systems except CHP, Switchyard, Ash Dyke and Township) shall be permanently discontinued w.e.f. 31st March 2024,&#8221; a regulatory filing said on Saturday.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-owned power giant NTPC has closed down its Barauni Thermal Power Station Stage-I of 220 MW permanently. NTPC is India&#8217;s largest power utility with a total installed capacity of 75,418 MW (including JVs), according to its official website. &#8220;Operation of NTPC Barauni Thermal Power Station Stage-I (2&#215;110 MW) comprising of two Units (Unit 6 &amp; 7) of 110 MW each (along with all Auxiliary systems except CHP, Switchyard, Ash Dyke and Township) shall be permanently discontinued w.e.f. 31st March 2024,&#8221; a regulatory filing said on Saturday.<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-640267","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/640267","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=640267"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/640267\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=640267"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=640267"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=640267"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}