{"id":639205,"date":"2024-03-20T18:17:55","date_gmt":"2024-03-20T12:47:55","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=639205"},"modified":"2024-03-20T18:17:55","modified_gmt":"2024-03-20T12:47:55","slug":"avaada-inclean-inks-pact-with-dvc-to-supply-power-from-421-mw-solar-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/avaada-inclean-inks-pact-with-dvc-to-supply-power-from-421-mw-solar-project\/","title":{"rendered":"Avaada Inclean inks pact with DVC to supply power from 421 MW solar project"},"content":{"rendered":"<p>Avaada Energy arm Avaada Inclean has inked a pact with Damodar Valley Corporation (DVC) to supply electricity from its 421 MW solar project in Gujarat. The company is planning to set up a 421 MW solar photovoltaic power project in Gujarat, a statement said.<\/p>\n<p>Avaada Energy has signed a 25-year Power Purchase Agreement (PPA) with DVC.<br \/>\nThe PPA was formally signed between Avaada Inclean Pvt Ltd, a wholly- owned subsidiary of Avaada Energy, and DVC at the latter\u2019s headquarters in Kolkata.<\/p>\n<p>Vineet Mittal, Chairperson of Avaada Group, said: \u201cAfter signing the agreement, Avaada Energy has become the first organization in the country to enter into a PPA under the power ministry\u2019s scheme for flexibility in Generation and Scheduling of Thermal\/Hydro Power Stations through bundling with Renewable Energy and Storage power.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Avaada Energy arm Avaada Inclean has inked a pact with Damodar Valley Corporation (DVC) to supply electricity from its 421 MW solar project in Gujarat. The company is planning to set up a 421 MW solar photovoltaic power project in Gujarat, a statement said. Avaada Energy has signed a 25-year Power Purchase Agreement (PPA) with DVC. The PPA was formally signed between Avaada Inclean Pvt Ltd, a wholly- owned subsidiary of Avaada Energy, and DVC at the latter\u2019s headquarters in Kolkata. Vineet Mittal, Chairperson of Avaada Group, said: \u201cAfter signing the agreement, Avaada Energy has become the first organization in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-639205","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/639205","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=639205"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/639205\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=639205"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=639205"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=639205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}