{"id":638274,"date":"2024-03-13T09:32:38","date_gmt":"2024-03-13T04:02:38","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=638274"},"modified":"2024-03-13T10:30:04","modified_gmt":"2024-03-13T05:00:04","slug":"h-g-infra-secures-rs-862-crore-highway-project-in-andhra-pradesh","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/h-g-infra-secures-rs-862-crore-highway-project-in-andhra-pradesh\/","title":{"rendered":"H.G. Infra secures Rs 862 crore highway project in Andhra Pradesh"},"content":{"rendered":"<p>H.G. Infra Engineering said that it has received the letter of award from the National Highways Authority of India (NHAI) for an Andhra Pradesh-based project worth Rs 862.11 crore. <\/p>\n<p>The project involves construction of a 4-lane highway with paved shoulders from the Tamil Nadu\/Andhra Pradesh border to Puttur and a 6-lane highway with paved shoulders from Mallavaram to Renigunta in the state of Andhra Pradesh. <\/p>\n<p>The hybrid annuity mode (HAM) is to be executed under NH(O),Chennai Tirupati Package-II, with a completion period of 24 months. The estimated cost reportedly is Rs 943.99 crore, and HG Infra&#8217;s bid cost is Rs 862.11 crore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>H.G. Infra Engineering said that it has received the letter of award from the National Highways Authority of India (NHAI) for an Andhra Pradesh-based project worth Rs 862.11 crore. The project involves construction of a 4-lane highway with paved shoulders from the Tamil Nadu\/Andhra Pradesh border to Puttur and a 6-lane highway with paved shoulders from Mallavaram to Renigunta in the state of Andhra Pradesh. The hybrid annuity mode (HAM) is to be executed under NH(O),Chennai Tirupati Package-II, with a completion period of 24 months. The estimated cost reportedly is Rs 943.99 crore, and HG Infra&#8217;s bid cost is Rs [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,168],"tags":[],"class_list":["post-638274","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-roads-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/638274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=638274"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/638274\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=638274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=638274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=638274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}