{"id":635201,"date":"2024-02-19T10:34:09","date_gmt":"2024-02-19T05:04:09","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=635201"},"modified":"2024-02-19T10:34:09","modified_gmt":"2024-02-19T05:04:09","slug":"athena-demwe-bid-nclat-rejects-navayuga-engineering-companys-plea","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/athena-demwe-bid-nclat-rejects-navayuga-engineering-companys-plea\/","title":{"rendered":"Athena Demwe bid: NCLAT rejects Navayuga Engineering Company&#8217;s plea"},"content":{"rendered":"<p>Mumbai: The National Company Law Appellate Tribunal (NCLAT) has rejected an appeal filed by Navayuga Engineering Company Ltd, which had challenged the lenders&#8217; decision to disqualify it from bidding for the 1,750 MW Athena Demwe Power Ltd on the Lohit river in Arunachal Pradesh.<\/p>\n<p>The Lower Demwe hydroelectric project, which is perceived to be of great strategic and national importance, has been in development since 2009. It was granted environmental clearance in 2010 but was delayed due to pending forest clearances.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mumbai: The National Company Law Appellate Tribunal (NCLAT) has rejected an appeal filed by Navayuga Engineering Company Ltd, which had challenged the lenders&#8217; decision to disqualify it from bidding for the 1,750 MW Athena Demwe Power Ltd on the Lohit river in Arunachal Pradesh. The Lower Demwe hydroelectric project, which is perceived to be of great strategic and national importance, has been in development since 2009. It was granted environmental clearance in 2010 but was delayed due to pending forest clearances.<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-635201","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/635201","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=635201"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/635201\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=635201"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=635201"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=635201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}