{"id":634584,"date":"2024-02-15T11:44:59","date_gmt":"2024-02-15T06:14:59","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=634584"},"modified":"2024-02-15T11:44:59","modified_gmt":"2024-02-15T06:14:59","slug":"adani-green-energy-shares-rise-4-as-551-mw-solar-capacity-gets-operational-in-gujarat","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/adani-green-energy-shares-rise-4-as-551-mw-solar-capacity-gets-operational-in-gujarat\/","title":{"rendered":"Adani Green Energy shares rise 4% as 551 MW solar capacity gets operational in Gujarat"},"content":{"rendered":"<p>Adani Green Energy (AGEL) shares rose nearly 4% to Rs 1,882 in Wednesday&#8217;s trade on BSE after the firm said that it has operationalized 551 MW solar capacity in Khavda, Gujarat, by supplying power to the national grid.<\/p>\n<p>&#8220;AGEL achieved this milestone within 12 months of commencing work on the Khavda RE park, starting with the development of basic infrastructure, including roads and connectivity, and creating a self-sustaining social ecosystem. AGEL also transformed the challenging and barren terrain of the Rann of Kutch into a habitable environment for its 8,000-strong workforce,&#8221; the company said in a BSE filing.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Adani Green Energy (AGEL) shares rose nearly 4% to Rs 1,882 in Wednesday&#8217;s trade on BSE after the firm said that it has operationalized 551 MW solar capacity in Khavda, Gujarat, by supplying power to the national grid. &#8220;AGEL achieved this milestone within 12 months of commencing work on the Khavda RE park, starting with the development of basic infrastructure, including roads and connectivity, and creating a self-sustaining social ecosystem. AGEL also transformed the challenging and barren terrain of the Rann of Kutch into a habitable environment for its 8,000-strong workforce,&#8221; the company said in a BSE filing.<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-634584","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/634584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=634584"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/634584\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=634584"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=634584"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=634584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}