{"id":633997,"date":"2024-02-12T12:20:24","date_gmt":"2024-02-12T06:50:24","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=633997"},"modified":"2024-02-12T12:20:24","modified_gmt":"2024-02-12T06:50:24","slug":"indian-railways-commissions-four-track-monitoring-machine-post-cags-red-flag","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/indian-railways-commissions-four-track-monitoring-machine-post-cags-red-flag\/","title":{"rendered":"Indian Railways commissions four track monitoring machine post CAG&#8217;s red flag"},"content":{"rendered":"<p>Four new Track Recording Cars, which help in carrying out super check of train track parameters, have been commissioned after a CAG report highlighted the shortfall, Railway Minister Ashwini Vaishnaw told the Rajya Sabha on Friday. Vaishnaw was responding to questions raised by All India Trinamool Congress MP Derek O&#8217;Brien who asked, &#8220;Whether any action has been taken to complete inspection of railway track safety in view of CAG&#8217;s observation that 50 per cent compulsory track safety inspection of railway tracks have not been completed.&#8221;<\/p>\n<p>The Railway Minister said, &#8220;Comptroller and Auditor General&#8217;s report had pointed out less inspection by Track Recording Car (TRC) during the period of study. TRC is only a means to carry out super checks of track parameters measured and monitored by permanent way gang, junior engineers, senior section engineers and tests checked at assistant divisional engineer level.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Four new Track Recording Cars, which help in carrying out super check of train track parameters, have been commissioned after a CAG report highlighted the shortfall, Railway Minister Ashwini Vaishnaw told the Rajya Sabha on Friday. Vaishnaw was responding to questions raised by All India Trinamool Congress MP Derek O&#8217;Brien who asked, &#8220;Whether any action has been taken to complete inspection of railway track safety in view of CAG&#8217;s observation that 50 per cent compulsory track safety inspection of railway tracks have not been completed.&#8221; The Railway Minister said, &#8220;Comptroller and Auditor General&#8217;s report had pointed out less inspection by [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,258,136],"tags":[],"class_list":["post-633997","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-railways-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/633997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=633997"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/633997\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=633997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=633997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=633997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}