{"id":632504,"date":"2024-02-01T16:14:14","date_gmt":"2024-02-01T10:44:14","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=632504"},"modified":"2024-02-01T16:14:14","modified_gmt":"2024-02-01T10:44:14","slug":"india-to-increase-coal-fired-capacity-in-2024-by-the-most-in-at-least-6-years","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/india-to-increase-coal-fired-capacity-in-2024-by-the-most-in-at-least-6-years\/","title":{"rendered":"India to increase coal-fired capacity in 2024 by the most in at least 6 years"},"content":{"rendered":"<p>India will start operating new coal-fired power plants with a combined capacity of 13.9 gigawatts (GW) this year, its power ministry said in a statement to Reuters, the highest annual increase in at least six years.<\/p>\n<p>Prime Minister Narendra Modi&#8217;s government has cited energy security concerns amid surging power demand and low per-capita emissions to defend India&#8217;s high dependence on coal. Power generation in 2023 increased by 11.3%, the fastest pace in at least five years.<\/p>\n<p>&#8220;In the next 18 months, about 19,600 MW (megawatts of) capacity is likely to be commissioned,&#8221; the power ministry said in a statement on Thursday. That will include the 13.9 GW likely to be commissioned this year.<\/p>\n<p>The 2024 capacity increase will be more than four times the annual average in the last five years. India added 4 GW of coal-fired power capacity in 2023, the most in a year since 2019.<\/p>\n<p>Coal-fired output surged 14.7% during the year, outpacing renewable energy output growth for the first time since at least 2019. Green energy output rose 12.2% in 2023, an analysis of daily load dispatch data from the federal grid regulator showed.<\/p>\n<p>The south Asian nation failed to achieve a target to add 175 GW of renewable power capacity by 2022. The planned coal-fired capacity increase in 2024 will exceed its 2023 renewables increase of 13 GW.<\/p>\n<p>The Ministry of Power has envisaged adding at least 53.6 GW of coal-fired power capacity over the eight years ending March 2032, it said, in addition to the 26.4 GW currently being constructed. Coal currently accounts for over 50% of India&#8217;s installed capacity of 428.3 GW.<\/p>\n<p>Construction of coal-fired projects has faced significant delays. However, New Delhi has begun a review of plants whose construction has been held up for years, moving to resolve issues over equipment and land acquisition delays.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>India will start operating new coal-fired power plants with a combined capacity of 13.9 gigawatts (GW) this year, its power ministry said in a statement to Reuters, the highest annual increase in at least six years. Prime Minister Narendra Modi&#8217;s government has cited energy security concerns amid surging power demand and low per-capita emissions to defend India&#8217;s high dependence on coal. Power generation in 2023 increased by 11.3%, the fastest pace in at least five years. &#8220;In the next 18 months, about 19,600 MW (megawatts of) capacity is likely to be commissioned,&#8221; the power ministry said in a statement on [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[131],"tags":[],"class_list":["post-632504","post","type-post","status-publish","format-standard","hentry","category-coal"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/632504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=632504"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/632504\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=632504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=632504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=632504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}