{"id":628654,"date":"2024-01-17T10:42:30","date_gmt":"2024-01-17T05:12:30","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=628654"},"modified":"2024-01-17T12:03:41","modified_gmt":"2024-01-17T06:33:41","slug":"indias-first-bullet-train-to-soon-get-state-of-art-electrification-throughout-the-508km-network-will-clock-320-kmph-speed-after-completion","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/indias-first-bullet-train-to-soon-get-state-of-art-electrification-throughout-the-508km-network-will-clock-320-kmph-speed-after-completion\/","title":{"rendered":"India\u2019s first bullet train to soon get state-of-art electrification throughout the 508km network; will clock 320 kmph speed after completion"},"content":{"rendered":"<p>The electrification process of the 508 km long Mumbai-Ahmedabad bullet train will kick start soon. It is a first-of-its-kind railway electrification project in India, which will involve the implementation of Japanese Shinkansen High-Speed Electrification Technology with sophisticated equipment including a Heavy Compound Catenary System, and Change Over Switches among others. <\/p>\n<p>India\u2019s multinational conglomerate Larsen &amp; Toubro\u2019s (L&amp;T) construction arm \u2013 the Railway Strategic Business Group has bagged the \u2018mega order\u2019 to set up an electrification system for the bullet train network in the country. The order has been bagged from an authorised Japanese agency.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The electrification process of the 508 km long Mumbai-Ahmedabad bullet train will kick start soon. It is a first-of-its-kind railway electrification project in India, which will involve the implementation of Japanese Shinkansen High-Speed Electrification Technology with sophisticated equipment including a Heavy Compound Catenary System, and Change Over Switches among others. India\u2019s multinational conglomerate Larsen &amp; Toubro\u2019s (L&amp;T) construction arm \u2013 the Railway Strategic Business Group has bagged the \u2018mega order\u2019 to set up an electrification system for the bullet train network in the country. The order has been bagged from an authorised Japanese agency.<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,264,138],"tags":[],"class_list":["post-628654","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-railways-the-financial-express","category-the-financial-express"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/628654","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=628654"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/628654\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=628654"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=628654"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=628654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}