{"id":625774,"date":"2024-01-02T09:18:36","date_gmt":"2024-01-02T03:48:36","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=625774"},"modified":"2024-01-02T09:44:28","modified_gmt":"2024-01-02T04:14:28","slug":"power-grid-corp-bags-transmission-project-for-rajasthans-20-gw-energy-zone","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/power-grid-corp-bags-transmission-project-for-rajasthans-20-gw-energy-zone\/","title":{"rendered":"Power Grid Corp bags transmission project for Rajasthan&#8217;s 20 GW energy zone"},"content":{"rendered":"<p>State-owned Power Grid Corporation has bagged an inter-state power transmission project for evacuating power from a 20 GW renewable energy zone in Rajasthan. <\/p>\n<p>The scope of the project comprises the establishment of two 765kV D\/C transmission lines traversing in Rajasthan and Delhi, along with associated bay extension works at existing substations located in Rajasthan and Delhi, a regulatory filing said. <\/p>\n<p>According to the filing, Power Grid Corporation has been declared as a successful bidder under Tariff Based Competitive Bidding to establish an Inter-State Transmission System for &#8220;Transmission system for evacuation of power from REZ in Rajasthan (20GW) under Phase-III Part D Phase I&#8221; on build, own operate and transfer (BOOT) basis.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-owned Power Grid Corporation has bagged an inter-state power transmission project for evacuating power from a 20 GW renewable energy zone in Rajasthan. The scope of the project comprises the establishment of two 765kV D\/C transmission lines traversing in Rajasthan and Delhi, along with associated bay extension works at existing substations located in Rajasthan and Delhi, a regulatory filing said. According to the filing, Power Grid Corporation has been declared as a successful bidder under Tariff Based Competitive Bidding to establish an Inter-State Transmission System for &#8220;Transmission system for evacuation of power from REZ in Rajasthan (20GW) under Phase-III Part [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-625774","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/625774","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=625774"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/625774\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=625774"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=625774"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=625774"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}