{"id":624914,"date":"2023-12-28T11:21:21","date_gmt":"2023-12-28T05:51:21","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=624914"},"modified":"2023-12-28T11:28:46","modified_gmt":"2023-12-28T05:58:46","slug":"cabinet-approves-6-lane-bridge-over-ganga-in-bihar-road-project-in-tripura","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/cabinet-approves-6-lane-bridge-over-ganga-in-bihar-road-project-in-tripura\/","title":{"rendered":"Cabinet approves 6-lane bridge over Ganga in Bihar, road project in Tripura"},"content":{"rendered":"<p>The Cabinet Committee on Economic Affairs chaired by the Prime Minister Narendra Modi, on Wednesday, gave its go ahead to construction of a bridge on Bihar and widening of a road in Tripura entailing an investment of over Rs 5500 crore.<\/p>\n<p>\u201cThe CCEA gave its approval for the construction of new 4556 m long, 6-lane high level and extra dosed cable stayed bridge across river Ganga (parallel to western side of existing Digha-Sonepur rail-cum road bridge) and its approaches on both sides in the districts of Patna and Saran (NH-139W) in Bihar on EPC mode,\u201d it said, adding that the total cost for the project is Rs 3,064.45 crore which includes civil construction cost of Rs 2,233.81 crore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Cabinet Committee on Economic Affairs chaired by the Prime Minister Narendra Modi, on Wednesday, gave its go ahead to construction of a bridge on Bihar and widening of a road in Tripura entailing an investment of over Rs 5500 crore. \u201cThe CCEA gave its approval for the construction of new 4556 m long, 6-lane high level and extra dosed cable stayed bridge across river Ganga (parallel to western side of existing Digha-Sonepur rail-cum road bridge) and its approaches on both sides in the districts of Patna and Saran (NH-139W) in Bihar on EPC mode,\u201d it said, adding that the [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,193,136],"tags":[],"class_list":["post-624914","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-roads-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/624914","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=624914"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/624914\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=624914"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=624914"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=624914"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}