{"id":621234,"date":"2023-12-05T16:46:15","date_gmt":"2023-12-05T11:16:15","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=621234"},"modified":"2023-12-05T16:46:15","modified_gmt":"2023-12-05T11:16:15","slug":"rs-493-crore-to-be-spent-on-improving-power-infra-in-himachal-border-villages-cm-sukhu","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/rs-493-crore-to-be-spent-on-improving-power-infra-in-himachal-border-villages-cm-sukhu\/","title":{"rendered":"Rs 493 crore to be spent on improving power infra in Himachal border villages: CM Sukhu"},"content":{"rendered":"<p>The power infrastructure will be strengthened in Himachal Pradesh&#8217;s border villages at a cost of Rs 493 crore to ensure reliable electricity supply to strategically important military and paramilitary establishments of Kinnaur and Lahaul-Spiti districts and its residents, Chief Minister Sukhvinder Singh Sukhu said on Monday. Two detailed project reports (DPRs) have been prepared over it, a statement issued here said. Rs 486.47 crore will be spent on the construction of two 66\/22 KV capacity and 2&#215;6.3 MVA substations at Sumdo and Kaza. A 130-km 66 KV line will also be laid from Pooh to Kaza.<\/p>\n<p>After the completion of these works, quality and reliable power supply would be ensured to Army establishments, Border Road Organisation and Indo-Tibet Border Police posts at border areas, the chief minister said.<\/p>\n<p>Thirteen distribution transformers (DTR) would be installed along with the associated 22 KV line at 13 border outposts, the statement said.<\/p>\n<p>Rs 6.49 crore would be incurred on the development of electrical distribution infrastructure in 32 villages &#8211; 12 villages of Kinnaur district and 20 villages of Spiti block of Lahaul-Spiti district, it said.<\/p>\n<p>The completion of this project will facilitate the tribal areas with quality, reliable and affordable power supply, the statement added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The power infrastructure will be strengthened in Himachal Pradesh&#8217;s border villages at a cost of Rs 493 crore to ensure reliable electricity supply to strategically important military and paramilitary establishments of Kinnaur and Lahaul-Spiti districts and its residents, Chief Minister Sukhvinder Singh Sukhu said on Monday. Two detailed project reports (DPRs) have been prepared over it, a statement issued here said. Rs 486.47 crore will be spent on the construction of two 66\/22 KV capacity and 2&#215;6.3 MVA substations at Sumdo and Kaza. A 130-km 66 KV line will also be laid from Pooh to Kaza. After the completion of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-621234","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/621234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=621234"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/621234\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=621234"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=621234"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=621234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}