{"id":616737,"date":"2023-11-13T09:31:33","date_gmt":"2023-11-13T04:01:33","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=616737"},"modified":"2023-11-13T09:50:43","modified_gmt":"2023-11-13T04:20:43","slug":"thdcil-inks-pacts-to-develop-3270-mw-renewable-energy-projects-in-ktaka","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/thdcil-inks-pacts-to-develop-3270-mw-renewable-energy-projects-in-ktaka\/","title":{"rendered":"THDCIL inks pacts to develop 3,270 MW renewable energy projects in K&#8217;taka"},"content":{"rendered":"<p>THDC India Ltd (THDCIL) is planning to set up 3,270 megawatts (MWs) of clean energy projects, including pumped storage and floating solar, in Karnataka, its chairman and managing director R K Vishnoi has said. <\/p>\n<p>In this regards, the Uttarakhand-based company on Thursday signed two memoranda of understandings with Karnataka Power Corporation Limited (KPCL) and Karnataka Renewable Energy Development Limited (KREDL) in Bengaluru. <\/p>\n<p>&#8220;These collaborative efforts encompass the development of a diverse range of projects, spanning ground-mounted, floating solar projects, and hybrid projects including pumped storage projects (PSPs) with a cumulative capacity of around 3,270 MW,&#8221; Vishnoi said in a company statement.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>THDC India Ltd (THDCIL) is planning to set up 3,270 megawatts (MWs) of clean energy projects, including pumped storage and floating solar, in Karnataka, its chairman and managing director R K Vishnoi has said. In this regards, the Uttarakhand-based company on Thursday signed two memoranda of understandings with Karnataka Power Corporation Limited (KPCL) and Karnataka Renewable Energy Development Limited (KREDL) in Bengaluru. &#8220;These collaborative efforts encompass the development of a diverse range of projects, spanning ground-mounted, floating solar projects, and hybrid projects including pumped storage projects (PSPs) with a cumulative capacity of around 3,270 MW,&#8221; Vishnoi said in a company [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-616737","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/616737","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=616737"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/616737\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=616737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=616737"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=616737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}