{"id":614596,"date":"2023-11-03T11:27:42","date_gmt":"2023-11-03T05:57:42","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=614596"},"modified":"2023-11-03T11:27:42","modified_gmt":"2023-11-03T05:57:42","slug":"keralas-longest-elevated-highway-work-gains-pace","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/keralas-longest-elevated-highway-work-gains-pace\/","title":{"rendered":"Kerala&#8217;s longest elevated highway work gains pace"},"content":{"rendered":"<p>KOCHI:  The construction of the state\u2019s longest elevated highway, stretching from Edappally in Ernakulam district to Thuravoor in Alappuzha district, has received a huge boost with the National Highways Authority of India (NHAI) preparing to install pier cap beams on the 12.75km Aroor-Thuravoor stretch of NH 66. So far, work on 300 pillars has been completed on that particular stretch.<\/p>\n<p>The installation of the pier cap beams will mark the completion of a significant phase in the construction of the elevated highway, work on which began a few months ago. To facilitate work on the busy stretch, the Ernakulam district administration has decided to impose a major traffic diversion. According to a statement issued by District Collector N S K Umesh, heavy vehicles will be diverted from the stretch between Thuravoor and Kundannoor. Vehicles equipped with containerised bodies exceeding a height of 4.5 metres, and coming from the northern districts en route to destinations like Kollam and Thiruvananthapuram, have been directed to take the MC Road via Angamaly. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>KOCHI: The construction of the state\u2019s longest elevated highway, stretching from Edappally in Ernakulam district to Thuravoor in Alappuzha district, has received a huge boost with the National Highways Authority of India (NHAI) preparing to install pier cap beams on the 12.75km Aroor-Thuravoor stretch of NH 66. So far, work on 300 pillars has been completed on that particular stretch. The installation of the pier cap beams will mark the completion of a significant phase in the construction of the elevated highway, work on which began a few months ago. To facilitate work on the busy stretch, the Ernakulam district [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,209,143],"tags":[],"class_list":["post-614596","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-roads-the-new-indian-express","category-the-new-indian-express"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/614596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=614596"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/614596\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=614596"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=614596"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=614596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}