{"id":611090,"date":"2023-10-19T09:30:51","date_gmt":"2023-10-19T04:00:51","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=611090"},"modified":"2023-10-19T10:07:12","modified_gmt":"2023-10-19T04:37:12","slug":"rs-20773-7-cr-cleared-for-transmission-line-to-evacuate-power-from-ladakh","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/rs-20773-7-cr-cleared-for-transmission-line-to-evacuate-power-from-ladakh\/","title":{"rendered":"Rs 20,773.7 cr cleared for transmission line to evacuate power from Ladakh"},"content":{"rendered":"<p>The Union Cabinet on Wednesday approved Rs 20,773.7 crore to set up a transmission line for evacuating power from for 13 GW renewable energy project in Ladakh. <\/p>\n<p>Prime Minister Narendra Modi in his Independence Day speech announced setting up a 7.5 GW Solar Park in Ladakh. <\/p>\n<p>After an extensive field survey, the Ministry of New and Renewable Energy (MNRE) prepared a plan to set up a 13 GW Renewable Energy (RE) generation capacity along with a 12 GWh Battery Energy Storage System (BESS) in Pang, Ladakh. <\/p>\n<p>For evacuating this huge quantum of power, it will be necessary to create an inter-state transmission infrastructure, an official release said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Union Cabinet on Wednesday approved Rs 20,773.7 crore to set up a transmission line for evacuating power from for 13 GW renewable energy project in Ladakh. Prime Minister Narendra Modi in his Independence Day speech announced setting up a 7.5 GW Solar Park in Ladakh. After an extensive field survey, the Ministry of New and Renewable Energy (MNRE) prepared a plan to set up a 13 GW Renewable Energy (RE) generation capacity along with a 12 GWh Battery Energy Storage System (BESS) in Pang, Ladakh. For evacuating this huge quantum of power, it will be necessary to create an [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-611090","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/611090","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=611090"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/611090\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=611090"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=611090"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=611090"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}