{"id":609763,"date":"2023-10-11T10:40:58","date_gmt":"2023-10-11T05:10:58","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=609763"},"modified":"2023-10-11T11:56:05","modified_gmt":"2023-10-11T06:26:05","slug":"uttar-pradesh-bridge-incident-why-did-balias-under-construction-bridge-worth-rs-8-crore-collapse","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/uttar-pradesh-bridge-incident-why-did-balias-under-construction-bridge-worth-rs-8-crore-collapse\/","title":{"rendered":"Uttar Pradesh bridge incident: Why did Balia\u2019s under-construction bridge worth Rs 8 crore collapse?"},"content":{"rendered":"<p>In a shocking development, a section of an 80-meter-long bridge under construction across the Magai River, undertaken by Setu Nigam, collapsed due to a beam failure. This bridge project was being constructed at a cost exceeding Rs 8 crore and aimed to connect Katharia and Firozpur. <\/p>\n<p>A three-member team has been assembled to conduct an investigation and deliver a report within three days, assuring that there have been no casualties thus far. <\/p>\n<p>Bridge being built at cost of Rs 8 crore 15 lakh <\/p>\n<p>District Magistrate Ravindra Kumar of Ballia explained, \u201cAn 80-meter long bridge was being constructed on the Magai river at a cost of Rs 8 crore 15 lakh.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a shocking development, a section of an 80-meter-long bridge under construction across the Magai River, undertaken by Setu Nigam, collapsed due to a beam failure. This bridge project was being constructed at a cost exceeding Rs 8 crore and aimed to connect Katharia and Firozpur. A three-member team has been assembled to conduct an investigation and deliver a report within three days, assuring that there have been no casualties thus far. Bridge being built at cost of Rs 8 crore 15 lakh District Magistrate Ravindra Kumar of Ballia explained, \u201cAn 80-meter long bridge was being constructed on the Magai [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,197,138],"tags":[],"class_list":["post-609763","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-roads-the-financial-express","category-the-financial-express"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/609763","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=609763"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/609763\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=609763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=609763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=609763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}