{"id":594428,"date":"2023-07-31T11:14:05","date_gmt":"2023-07-31T05:44:05","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=594428"},"modified":"2023-07-31T11:14:05","modified_gmt":"2023-07-31T05:44:05","slug":"rays-power-infra-serentica-renewables-to-set-up-283-mw-solar-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/rays-power-infra-serentica-renewables-to-set-up-283-mw-solar-project\/","title":{"rendered":"Rays Power Infra, Serentica Renewables to set up 283 MW solar project"},"content":{"rendered":"<p>Rays Power Infra on Friday said it has signed an agreement with Serentica Renewables for a 283-megawatt solar project. The engineering, procurement, and construction (EPC) project will be using single-axis trackers and bifacial modules, Rays Power Infra said in a statement.<\/p>\n<p>&#8220;Rays Power Infra has signed an EPC term sheet with Serentica Renewables. Rays Power Infra shall be responsible for the engineering, procurement, and construction of a 283 MW DC solar PV project using single-axis trackers and bifacial modules,&#8221; it said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rays Power Infra on Friday said it has signed an agreement with Serentica Renewables for a 283-megawatt solar project. The engineering, procurement, and construction (EPC) project will be using single-axis trackers and bifacial modules, Rays Power Infra said in a statement. &#8220;Rays Power Infra has signed an EPC term sheet with Serentica Renewables. Rays Power Infra shall be responsible for the engineering, procurement, and construction of a 283 MW DC solar PV project using single-axis trackers and bifacial modules,&#8221; it said.<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-594428","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/594428","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=594428"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/594428\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=594428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=594428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=594428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}