{"id":588562,"date":"2023-07-03T10:38:47","date_gmt":"2023-07-03T05:08:47","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=588562"},"modified":"2023-07-03T11:37:50","modified_gmt":"2023-07-03T06:07:50","slug":"bullet-train-project-3-river-bridges-built-in-1-month-in-guj","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/bullet-train-project-3-river-bridges-built-in-1-month-in-guj\/","title":{"rendered":"Bullet train project: 3 river bridges built in 1 month in Guj"},"content":{"rendered":"<p>Making a significant progress, the National High-Speed Rail Corporation Limited (NHSRCL) has constructed three river bridges in a period of one month for the Mumbai-Ahmedabad High-Speed Rail (MAHSR), also known as the bullet train project.<\/p>\n<p>In a statement issued on Sunday, the NHSRCL said that all these bridges are in Gujarat and are located between Bilimora and Surat stations of the bullet train.<\/p>\n<p>The first river bridge was completed on Purna river in Navsari district. The 360-m-long bridge consists of nine full span girders. Continuous monitoring of high and low tides from Arabian Sea was done during the construction. The foundation work was challenging as water level in the river would rise 5-6 m during high tides, it added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Making a significant progress, the National High-Speed Rail Corporation Limited (NHSRCL) has constructed three river bridges in a period of one month for the Mumbai-Ahmedabad High-Speed Rail (MAHSR), also known as the bullet train project. In a statement issued on Sunday, the NHSRCL said that all these bridges are in Gujarat and are located between Bilimora and Surat stations of the bullet train. The first river bridge was completed on Purna river in Navsari district. The 360-m-long bridge consists of nine full span girders. Continuous monitoring of high and low tides from Arabian Sea was done during the construction. The [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,263,144],"tags":[],"class_list":["post-588562","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-railways-the-pioneer","category-the-pioneer"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/588562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=588562"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/588562\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=588562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=588562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=588562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}