{"id":584043,"date":"2023-06-13T09:34:52","date_gmt":"2023-06-13T04:04:52","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=584043"},"modified":"2023-06-13T09:58:14","modified_gmt":"2023-06-13T04:28:14","slug":"sjvn-green-energy-bagged-200-mw-wind-energy-project-worth-rs-1400-cr","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/sjvn-green-energy-bagged-200-mw-wind-energy-project-worth-rs-1400-cr\/","title":{"rendered":"SJVN Green Energy bagged 200 MW wind energy project worth Rs 1,400 cr"},"content":{"rendered":"<p>State-owned SJVN Ltd arm SJVN Green Energy on Monday bagged a 200 MW wind power project entailing an investment of Rs 1,400 crore in a tariff-based competitive bidding conducted by Solar Energy Corporation of India.<\/p>\n<p>This wind power project will be developed by SJVN Green Energy anywhere in India through EPC (engineering procurement construction) contract, a BSE filing stated. <\/p>\n<p>The tentative cost of construction\/development of this project is Rs 1,400 crore, it said.<\/p>\n<p>SJVN Green Energy, a wholly-owned subsidiary of SJVN Ltd, participated in the tariff-based competitive bidding process for the selection of wind power developers for setting up of 1,200 MW ISTS (inter-state transmission system) connected wind power projects in India (Phase-XIV)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-owned SJVN Ltd arm SJVN Green Energy on Monday bagged a 200 MW wind power project entailing an investment of Rs 1,400 crore in a tariff-based competitive bidding conducted by Solar Energy Corporation of India. This wind power project will be developed by SJVN Green Energy anywhere in India through EPC (engineering procurement construction) contract, a BSE filing stated. The tentative cost of construction\/development of this project is Rs 1,400 crore, it said. SJVN Green Energy, a wholly-owned subsidiary of SJVN Ltd, participated in the tariff-based competitive bidding process for the selection of wind power developers for setting up of [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-584043","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/584043","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=584043"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/584043\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=584043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=584043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=584043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}