{"id":581299,"date":"2023-06-02T09:36:15","date_gmt":"2023-06-02T04:06:15","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=581299"},"modified":"2023-06-02T10:52:44","modified_gmt":"2023-06-02T05:22:44","slug":"lt-to-build-energy-infra-for-worlds-largest-green-hydrogen-plant-at-neom","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/lt-to-build-energy-infra-for-worlds-largest-green-hydrogen-plant-at-neom\/","title":{"rendered":"L&amp;T to build energy infra for world&#8217;s largest green hydrogen plant at NEOM"},"content":{"rendered":"<p>L&amp;T Construction will create renewable energy infrastructure for the world\u2019s largest green hydrogen plant at NEOM, the company said in a BSE filing. <\/p>\n<p>L&amp;T will engineer, procure, and construct a 2.2 GWac PV solar plant, 1.65 GW wind generation balance of plant and a 400 MWh battery energy storage system at Oxagon in Saudi Arabia\u2019s region of NEOM. <\/p>\n<p>NEOM Green Hydrogen Company (NGHC) is an equal joint-venture by ACWA Power, Air Products and NEOM. <\/p>\n<p>It will also construct three 380 kV switching stations, 306 kilometres of 380 kV overhead lines and UG cables required for the Kingdom\u2019s grid network. The scope also includes the Energy Power Monitoring System (EPMS) for the complete network.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>L&amp;T Construction will create renewable energy infrastructure for the world\u2019s largest green hydrogen plant at NEOM, the company said in a BSE filing. L&amp;T will engineer, procure, and construct a 2.2 GWac PV solar plant, 1.65 GW wind generation balance of plant and a 400 MWh battery energy storage system at Oxagon in Saudi Arabia\u2019s region of NEOM. NEOM Green Hydrogen Company (NGHC) is an equal joint-venture by ACWA Power, Air Products and NEOM. It will also construct three 380 kV switching stations, 306 kilometres of 380 kV overhead lines and UG cables required for the Kingdom\u2019s grid network. The [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-581299","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/581299","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=581299"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/581299\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=581299"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=581299"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=581299"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}