{"id":580920,"date":"2023-06-01T09:22:14","date_gmt":"2023-06-01T03:52:14","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=580920"},"modified":"2023-06-01T09:55:41","modified_gmt":"2023-06-01T04:25:41","slug":"national-electricity-plan-coal-to-fall-behind-renewables-by-2032","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/national-electricity-plan-coal-to-fall-behind-renewables-by-2032\/","title":{"rendered":"National Electricity Plan: Coal to fall behind renewables by 2032"},"content":{"rendered":"<p>India\u2019s power generation capacity is expected to touch 900 gigawatt (Gw) by the end of this decade, with major capacity addition coming from renewable energy sources, such as solar, wind, and large hydro, said the latest National Electricity Plan (NEP) by the Central Electricity Authority (CEA). <\/p>\n<p>The CEA, the technical arm of the power ministry, prepares NEP every five years forecasting the country\u2019s power generation, transmission, and demand trajectory for the coming decade. In the latest NEP, the CEA has observed a significant slowdown in the coal capacity addition in the country. It is expecting the renewable energy capacity to double from the current levels.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>India\u2019s power generation capacity is expected to touch 900 gigawatt (Gw) by the end of this decade, with major capacity addition coming from renewable energy sources, such as solar, wind, and large hydro, said the latest National Electricity Plan (NEP) by the Central Electricity Authority (CEA). The CEA, the technical arm of the power ministry, prepares NEP every five years forecasting the country\u2019s power generation, transmission, and demand trajectory for the coming decade. In the latest NEP, the CEA has observed a significant slowdown in the coal capacity addition in the country. It is expecting the renewable energy capacity to [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-580920","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/580920","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=580920"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/580920\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=580920"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=580920"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=580920"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}