{"id":577641,"date":"2023-05-18T16:20:15","date_gmt":"2023-05-18T10:50:15","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=577641"},"modified":"2023-05-18T18:17:42","modified_gmt":"2023-05-18T12:47:42","slug":"dwarka-expressway-will-be-completed-in-next-3-4-months-nitin-gadkari","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/dwarka-expressway-will-be-completed-in-next-3-4-months-nitin-gadkari\/","title":{"rendered":"Dwarka Expressway will be completed in next 3-4 months: Nitin Gadkari"},"content":{"rendered":"<p>Dwarka Expressway, India&#8217;s first elevated urban expressway, being constructed at an estimated cost of Rs 10,000 crore, as part of the Delhi decongestion plan, will be completed in the next 3-4 months, Union Minister Nitin Gadkari said on Thursday. The Expressway will be completed in four packages, he added. <\/p>\n<p>The road transport minister said Dwarka Expressway will have a fully-automated tolling system and the entire project will be equipped with an intelligent transportation system (ITS). <\/p>\n<p>Dwarka Expressway starts near Shiv Murti on NH-8 and terminates near Kherki Daula Toll plaza on NH-8. <\/p>\n<p>The total length of Dwarka Expressway is 29 km, out of which 18.9 km length falls in Haryana, while the remaining 10.1 km is in Delhi. <\/p>\n<p>It will provide connectivity to Indira Gandhi International Airport from Dwarka side through Dwarka Expressway. <\/p>\n<p>In addition the proposed Dwarka Expressway would provide direct access to upcoming India International Convention Centre in sector 25 of Dwarka.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dwarka Expressway, India&#8217;s first elevated urban expressway, being constructed at an estimated cost of Rs 10,000 crore, as part of the Delhi decongestion plan, will be completed in the next 3-4 months, Union Minister Nitin Gadkari said on Thursday. The Expressway will be completed in four packages, he added. The road transport minister said Dwarka Expressway will have a fully-automated tolling system and the entire project will be equipped with an intelligent transportation system (ITS). Dwarka Expressway starts near Shiv Murti on NH-8 and terminates near Kherki Daula Toll plaza on NH-8. The total length of Dwarka Expressway is 29 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[230],"tags":[],"class_list":["post-577641","post","type-post","status-publish","format-standard","hentry","category-roads"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/577641","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=577641"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/577641\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=577641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=577641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=577641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}