{"id":575709,"date":"2023-05-09T15:58:41","date_gmt":"2023-05-09T10:28:41","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=575709"},"modified":"2023-05-09T15:58:41","modified_gmt":"2023-05-09T10:28:41","slug":"k-p-energy-commissions-29-mw-wind-energy-project-in-gujarat","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/k-p-energy-commissions-29-mw-wind-energy-project-in-gujarat\/","title":{"rendered":"K P Energy commissions 29 MW wind energy project in Gujarat"},"content":{"rendered":"<p>K P Energy Ltd on Monday announced the commissioning of a 29.4 mega watt (MW) wind energy project in Gujarat.<\/p>\n<p>The capacity is a part of the 250.8 MW ISTS connected wind power project capacity awarded by Solar Energy Corporation of India Limited (SECI) under Tranche-VIII bidding, the company said in a regulatory filing.<\/p>\n<p>&#8220;In furtherance of of phase-I at Sidhpur, KP Energy has successfully commissioned 29.4 MW (phase-II) ISTS (inter state transmission system) connected wind power project comprising 14 numbers of WTGs (wind turbine generators) of 2.1 MW each at Sidhpur site in Devbhoomi Dwarka,&#8221; it said.<\/p>\n<p>With the present phase-II commissioning the net cumulative capacity commissioned stands at 81.9 MW.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>K P Energy Ltd on Monday announced the commissioning of a 29.4 mega watt (MW) wind energy project in Gujarat. The capacity is a part of the 250.8 MW ISTS connected wind power project capacity awarded by Solar Energy Corporation of India Limited (SECI) under Tranche-VIII bidding, the company said in a regulatory filing. &#8220;In furtherance of of phase-I at Sidhpur, KP Energy has successfully commissioned 29.4 MW (phase-II) ISTS (inter state transmission system) connected wind power project comprising 14 numbers of WTGs (wind turbine generators) of 2.1 MW each at Sidhpur site in Devbhoomi Dwarka,&#8221; it said. With the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-575709","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/575709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=575709"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/575709\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=575709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=575709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=575709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}