{"id":556828,"date":"2023-02-20T09:14:22","date_gmt":"2023-02-20T03:44:22","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=556828"},"modified":"2023-02-20T09:52:22","modified_gmt":"2023-02-20T04:22:22","slug":"india-nepal-agree-to-add-200-mw-to-dhalkebar-muzaffarpur-transmission-line","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/india-nepal-agree-to-add-200-mw-to-dhalkebar-muzaffarpur-transmission-line\/","title":{"rendered":"India, Nepal agree to add 200 MW to Dhalkebar-Muzaffarpur transmission line"},"content":{"rendered":"<p>Nepal and India have inked an agreement to increase the power import and export capacity through the Dhalkebar-Muzaffarpur transmission line from 600 megawatts to 800 megawatts, authorities here said on Sunday.<\/p>\n<p>The agreement was reached at the Energy Secretary-level Joint Steering Committee (JSC) meeting in Mount Abu, Rajasthan, on Saturday, according to a press release issued by the Ministry of Energy on Sunday.<\/p>\n<p>During the 10th meeting of Nepal India Energy Secretary-level JSC, discussions were held on various important issues such as expanding the power of existing, under-construction and proposed transmission lines, Arun Third hydroelectric power, and related transmission line projects and international power export and import,&#8221; the press release said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nepal and India have inked an agreement to increase the power import and export capacity through the Dhalkebar-Muzaffarpur transmission line from 600 megawatts to 800 megawatts, authorities here said on Sunday. The agreement was reached at the Energy Secretary-level Joint Steering Committee (JSC) meeting in Mount Abu, Rajasthan, on Saturday, according to a press release issued by the Ministry of Energy on Sunday. During the 10th meeting of Nepal India Energy Secretary-level JSC, discussions were held on various important issues such as expanding the power of existing, under-construction and proposed transmission lines, Arun Third hydroelectric power, and related transmission line [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-556828","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/556828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=556828"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/556828\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=556828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=556828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=556828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}