{"id":554397,"date":"2023-02-10T11:16:04","date_gmt":"2023-02-10T05:46:04","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=554397"},"modified":"2023-02-10T11:16:04","modified_gmt":"2023-02-10T05:46:04","slug":"mumbai-ahmedabad-bullet-train-technical-bids-for-21-km-tunnel-including-undersea-stretch-opened","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/mumbai-ahmedabad-bullet-train-technical-bids-for-21-km-tunnel-including-undersea-stretch-opened\/","title":{"rendered":"Mumbai-Ahmedabad bullet train: Technical bids for 21-km tunnel, including undersea stretch, opened"},"content":{"rendered":"<p>The technical bids for the construction of a 21-kilometre tunnel, 7 kilometres of which will be under the sea, as part of the Mumbai-Ahmedabad high speed rail corridor, popularly called the &#8216;bullet train project, was opened on Thursday, an official said. Two bids have been received from Afcons Infrastructure Limited and Larsen &amp; Toubro Limited for the C-2 package between Bandra-Kurla Complex in Mumbai and Shilphata in Thane district, a National High Speed Rail Corporation Limited spokesperson said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The technical bids for the construction of a 21-kilometre tunnel, 7 kilometres of which will be under the sea, as part of the Mumbai-Ahmedabad high speed rail corridor, popularly called the &#8216;bullet train project, was opened on Thursday, an official said. Two bids have been received from Afcons Infrastructure Limited and Larsen &amp; Toubro Limited for the C-2 package between Bandra-Kurla Complex in Mumbai and Shilphata in Thane district, a National High Speed Rail Corporation Limited spokesperson said.<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,258,136],"tags":[],"class_list":["post-554397","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-railways-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/554397","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=554397"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/554397\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=554397"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=554397"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=554397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}