{"id":553806,"date":"2023-02-08T09:01:03","date_gmt":"2023-02-08T03:31:03","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=553806"},"modified":"2023-02-08T09:16:18","modified_gmt":"2023-02-08T03:46:18","slug":"indias-non-fossil-power-generation-touches-174-gw-in-2022-r-k-singh","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/indias-non-fossil-power-generation-touches-174-gw-in-2022-r-k-singh\/","title":{"rendered":"India&#8217;s non-fossil power generation touches 174 GW in 2022: R K Singh"},"content":{"rendered":"<p>India&#8217;s non-fossil fuel-based power generation capacity was at 174.53 gigawatt (GW) at the end of December 31, 2022, Parliament was informed on Tuesday.<\/p>\n<p>The country&#8217;s total power generation capacity, including 235.81 GW from the thermal base, was at 410 GW at the end of 2022, Minister for Power, New and Renewable Energy R K Singh said in a written reply to the Rajya Sabha.<\/p>\n<p>&#8220;So far, a total of 174.53 GW power generation capacity from non-fossil fuel-based energy resources has been installed in the country as on 31.12.2022,&#8221; he said.<\/p>\n<p>The capacity includes 63.30 GW solar power, 46.85 GW large hydro, 41.93 GW wind power, 10.73 GW bio power, 4.94 GW small hydro power and 6.78 GW nuclear power.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>India&#8217;s non-fossil fuel-based power generation capacity was at 174.53 gigawatt (GW) at the end of December 31, 2022, Parliament was informed on Tuesday. The country&#8217;s total power generation capacity, including 235.81 GW from the thermal base, was at 410 GW at the end of 2022, Minister for Power, New and Renewable Energy R K Singh said in a written reply to the Rajya Sabha. &#8220;So far, a total of 174.53 GW power generation capacity from non-fossil fuel-based energy resources has been installed in the country as on 31.12.2022,&#8221; he said. The capacity includes 63.30 GW solar power, 46.85 GW large [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-553806","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/553806","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=553806"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/553806\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=553806"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=553806"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=553806"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}