{"id":550580,"date":"2023-01-28T11:21:53","date_gmt":"2023-01-28T05:51:53","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=550580"},"modified":"2023-01-28T13:17:26","modified_gmt":"2023-01-28T07:47:26","slug":"luminous-to-build-indias-first-green-solar-panel-factory-in-uttarakhand","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/luminous-to-build-indias-first-green-solar-panel-factory-in-uttarakhand\/","title":{"rendered":"Luminous to build India&#8217;s first green solar panel factory in Uttarakhand"},"content":{"rendered":"<p>Luminous Power Technologies on Friday announced its plan to build the country&#8217;s first green energy-based solar panel manufacturing facility in Uttarakhand. The new manufacturing plant located in Rudrapur is expected to be fully operational by the end of this year, a company statement said.<\/p>\n<p>The state-of-the-art facility will be equipped with the latest technology to design and produce high-quality solar panels that will be used for both residential and commercial applications, it stated.<\/p>\n<p>Once operational, the facility, spread across 4.5 lakh square feet\/10 acres will help enable a solar production capacity of 500 MW per annum, expandable up to 1 GW, producing a range of solar panels with a power output of 40W to 600W.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Luminous Power Technologies on Friday announced its plan to build the country&#8217;s first green energy-based solar panel manufacturing facility in Uttarakhand. The new manufacturing plant located in Rudrapur is expected to be fully operational by the end of this year, a company statement said. The state-of-the-art facility will be equipped with the latest technology to design and produce high-quality solar panels that will be used for both residential and commercial applications, it stated. Once operational, the facility, spread across 4.5 lakh square feet\/10 acres will help enable a solar production capacity of 500 MW per annum, expandable up to 1 [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-550580","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/550580","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=550580"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/550580\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=550580"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=550580"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=550580"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}