{"id":550219,"date":"2023-01-27T10:15:00","date_gmt":"2023-01-27T04:45:00","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=550219"},"modified":"2023-01-27T11:54:41","modified_gmt":"2023-01-27T06:24:41","slug":"budget-2023-24-wishlist-herere-key-challenges-in-renewable-energy-sector","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/budget-2023-24-wishlist-herere-key-challenges-in-renewable-energy-sector\/","title":{"rendered":"Budget 2023-24 wishlist: Here&#8217;re key challenges in renewable energy sector"},"content":{"rendered":"<p>Key challenges <\/p>\n<p>    India missed the 175-Gw green energy target by the end of 2022 by 55 Gw as due to slow progress in project development<br \/>\n    Solar rooftop saw limited growth due to lack of growth in key green energy tech sectors<br \/>\n    Concentrated supply chains in China for a number of facets resulting in increased prices for key raw material, components<br \/>\n    High interest rates in India results in costlier green power, affecting overall commercial viability and cost parity with fossil fuel power<br \/>\n    There is limited access to financing for renewable energy manufacturing<\/p>\n<p>Industry ask<\/p>\n<p>    Production-linked incentive scheme in critical sectors<br \/>\n    Reduction in goods and services tax rates and duties<br \/>\n    Specific impetus for select Sectors<br \/>\n    Lowering interest rate for green energy<br \/>\n    Regulatory mandates<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Key challenges India missed the 175-Gw green energy target by the end of 2022 by 55 Gw as due to slow progress in project development Solar rooftop saw limited growth due to lack of growth in key green energy tech sectors Concentrated supply chains in China for a number of facets resulting in increased prices for key raw material, components High interest rates in India results in costlier green power, affecting overall commercial viability and cost parity with fossil fuel power There is limited access to financing for renewable energy manufacturing Industry ask Production-linked incentive scheme in critical sectors Reduction [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-550219","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/550219","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=550219"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/550219\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=550219"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=550219"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=550219"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}