{"id":547248,"date":"2023-01-13T11:37:20","date_gmt":"2023-01-13T06:07:20","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=547248"},"modified":"2023-01-13T11:37:20","modified_gmt":"2023-01-13T06:07:20","slug":"reverse-auction-for-56-gw-wind-power-capacity-scrapped","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/reverse-auction-for-56-gw-wind-power-capacity-scrapped\/","title":{"rendered":"Reverse auction for 56 GW wind power capacity scrapped"},"content":{"rendered":"<p>NEW DELHI: The government has scrapped the reverse auction process for wind power projects and will offer cumulative 8 GW (gigawatts) capacity every year till 2030 through single-stage closed-envelop bidding, accepting a long-pending demand from the industry.<\/p>\n<p>The revised norms also prescribe tariff-pooling to supply power at a uniform rate to all consumers, a move that is seen expediting capacity addition in all the eight windy states, sources said.<\/p>\n<p>Bids will henceforth be state-specific wherein the project promoters will offer the tariff based on the cost of feeding the power into the grid at the particular interconnect point identified by them.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW DELHI: The government has scrapped the reverse auction process for wind power projects and will offer cumulative 8 GW (gigawatts) capacity every year till 2030 through single-stage closed-envelop bidding, accepting a long-pending demand from the industry. The revised norms also prescribe tariff-pooling to supply power at a uniform rate to all consumers, a move that is seen expediting capacity addition in all the eight windy states, sources said. Bids will henceforth be state-specific wherein the project promoters will offer the tariff based on the cost of feeding the power into the grid at the particular interconnect point identified by [&hellip;]<\/p>\n","protected":false},"author":44,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,246,137],"tags":[],"class_list":["post-547248","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-times-of-india","category-the-times-of-india"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/547248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=547248"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/547248\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=547248"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=547248"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=547248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}