{"id":541600,"date":"2022-12-08T09:29:39","date_gmt":"2022-12-08T03:59:39","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=541600"},"modified":"2022-12-08T10:24:16","modified_gmt":"2022-12-08T04:54:16","slug":"single-day-peak-power-demand-to-rise-by-up-to-35000-mw-in-april-power-min","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/single-day-peak-power-demand-to-rise-by-up-to-35000-mw-in-april-power-min\/","title":{"rendered":"Single-day peak power demand to rise by up to 35,000 MW in April: Power min"},"content":{"rendered":"<p>The single-day peak demand for power is expected to increase by up to 35,000 MW in April 2023 and the government has started preparations to meet the same, Union minister R K Singh said on Wednesday. <\/p>\n<p>Speaking to PTI, the minister for power, new &amp; renewable energy said he is taking up a meeting this evening to review the preparation of the expected demand which will be seen in April next year. <\/p>\n<p>According to official figures, the maximum all-India power demand met at 2:51 pm in April 2022 was 201.066 GW. <\/p>\n<p>The single-day demand is expected to grow by 30,000 MW to 35,000 MW in April, Singh said on the sidelines of the launch of &#8216;Plan on Transmission System for integration of 500-MW non-fossil Fuel Capacity by 2030&#8217;.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The single-day peak demand for power is expected to increase by up to 35,000 MW in April 2023 and the government has started preparations to meet the same, Union minister R K Singh said on Wednesday. Speaking to PTI, the minister for power, new &amp; renewable energy said he is taking up a meeting this evening to review the preparation of the expected demand which will be seen in April next year. According to official figures, the maximum all-India power demand met at 2:51 pm in April 2022 was 201.066 GW. The single-day demand is expected to grow by 30,000 [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,232],"tags":[],"class_list":["post-541600","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-power-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/541600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=541600"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/541600\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=541600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=541600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=541600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}