{"id":541125,"date":"2022-12-06T10:21:04","date_gmt":"2022-12-06T04:51:04","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=541125"},"modified":"2022-12-06T11:02:29","modified_gmt":"2022-12-06T05:32:29","slug":"lt-bags-new-large-order-in-proposed-mumbai-ahmedabad-bullet-train-project","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/lt-bags-new-large-order-in-proposed-mumbai-ahmedabad-bullet-train-project\/","title":{"rendered":"L&amp;T bags new large order in proposed Mumbai-Ahmedabad bullet train project"},"content":{"rendered":"<p>Larsen and Toubro (L&amp;T) on Monday said it has bagged another &#8220;large&#8221; order in the proposed Mumbai-Ahmedabad bullet train project from the National High-Speed Rail Corporation.<\/p>\n<p>The project involves commissioning of a depot spread over around 82 hectares in Gujarat, L&amp;T said in a filing to exchanges.<\/p>\n<p>Though the engineering and construction giant did not reveal the worth of the order, as per the project classification of the company, a large project falls in the range of Rs 2,500 crore to Rs 5,000 crore.<\/p>\n<p>&#8220;The buildings and factories business of L&amp;T Construction has secured an order from the National High-Speed Rail Corporation Limited (NHSRCL) to construct the Sabarmati Depot (MAHSR D-2) in Gujarat for the (MAHSR project through a consortium led by Sojitz Corporation, Japan,&#8221; it said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Larsen and Toubro (L&amp;T) on Monday said it has bagged another &#8220;large&#8221; order in the proposed Mumbai-Ahmedabad bullet train project from the National High-Speed Rail Corporation. The project involves commissioning of a depot spread over around 82 hectares in Gujarat, L&amp;T said in a filing to exchanges. Though the engineering and construction giant did not reveal the worth of the order, as per the project classification of the company, a large project falls in the range of Rs 2,500 crore to Rs 5,000 crore. &#8220;The buildings and factories business of L&amp;T Construction has secured an order from the National High-Speed [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[135,130,256],"tags":[],"class_list":["post-541125","post","type-post","status-publish","format-standard","hentry","category-business-standard-newspapers","category-newspapers","category-railways-business-standard-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/541125","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=541125"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/541125\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=541125"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=541125"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=541125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}