{"id":538573,"date":"2022-11-25T15:48:23","date_gmt":"2022-11-25T10:18:23","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=538573"},"modified":"2022-11-25T15:48:23","modified_gmt":"2022-11-25T10:18:23","slug":"sjvn-commissions-75mw-solar-project-in-uttar-pradesh","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/sjvn-commissions-75mw-solar-project-in-uttar-pradesh\/","title":{"rendered":"SJVN commissions 75MW solar project in Uttar Pradesh"},"content":{"rendered":"<p>State-run SJVN Ltd on Thursday said it has commissioned a 75 MW solar power project at Parasan Solar Park in Uttar Pradesh.<\/p>\n<p>SJVN Chairman &#038; Managing Director Nand Lal Sharma said that with the 75 MW Parasan Solar Power Project achieving commercial operation, the power producer&#8217;s installed generation capacity stands at 2,091.5 MW.<\/p>\n<p>Sharma further said that the Parasan solar power project was bagged at a tariff of Rs 2.68 per unit on Build Own and Operate basis and has been developed at a cost of Rs 392 crore.<\/p>\n<p>The Power Purchase Agreement for the project has been signed with Uttar Pradesh Power Corporation Ltd for 25 years.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>State-run SJVN Ltd on Thursday said it has commissioned a 75 MW solar power project at Parasan Solar Park in Uttar Pradesh. SJVN Chairman &#038; Managing Director Nand Lal Sharma said that with the 75 MW Parasan Solar Power Project achieving commercial operation, the power producer&#8217;s installed generation capacity stands at 2,091.5 MW. Sharma further said that the Parasan solar power project was bagged at a tariff of Rs 2.68 per unit on Build Own and Operate basis and has been developed at a cost of Rs 392 crore. The Power Purchase Agreement for the project has been signed with [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-538573","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/538573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=538573"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/538573\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=538573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=538573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=538573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}