{"id":535698,"date":"2022-11-11T10:40:46","date_gmt":"2022-11-11T05:10:46","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=535698"},"modified":"2022-11-11T11:39:59","modified_gmt":"2022-11-11T06:09:59","slug":"mumbai-pune-expressway-missing-link-project-60-over-to-have-asias-widest-tunnel","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/mumbai-pune-expressway-missing-link-project-60-over-to-have-asias-widest-tunnel\/","title":{"rendered":"Mumbai-Pune expressway \u2018missing link\u2019 project 60% over, to have Asia\u2019s widest tunnel"},"content":{"rendered":"<p>The \u201cmissing link\u201d project on the Mumbai-Pune expressway has attained 60 per cent progress, according to the Maharashtra State Road Development Corporation. <\/p>\n<p>The missing link project, which includes a viaduct and a cable-stayed bridge, will also have a 10.55-km-long tunnel. At 23.75m, it will be the widest tunnel in Asia, according to the corporation. The tunnel, a part of which is being constructed more than 100m below the Lonavala lake, uses the controlled-blasting method. <\/p>\n<p>The project is targeted to be ready by December 2023. Once open to traffic, the missing link will prevent bottlenecks at Khandala, providing for a seamless travelling experience. The project is proposed to make the expressway a \u201czero-fatality corridor\u201d.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The \u201cmissing link\u201d project on the Mumbai-Pune expressway has attained 60 per cent progress, according to the Maharashtra State Road Development Corporation. The missing link project, which includes a viaduct and a cable-stayed bridge, will also have a 10.55-km-long tunnel. At 23.75m, it will be the widest tunnel in Asia, according to the corporation. The tunnel, a part of which is being constructed more than 100m below the Lonavala lake, uses the controlled-blasting method. The project is targeted to be ready by December 2023. Once open to traffic, the missing link will prevent bottlenecks at Khandala, providing for a seamless [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130],"tags":[],"class_list":["post-535698","post","type-post","status-publish","format-standard","hentry","category-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/535698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=535698"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/535698\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=535698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=535698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=535698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}