{"id":524576,"date":"2022-09-24T10:53:54","date_gmt":"2022-09-24T05:23:54","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=524576"},"modified":"2022-09-24T10:53:54","modified_gmt":"2022-09-24T05:23:54","slug":"sterling-wilson-hits-upper-circuit-after-subsidiary-signs-mou-with-nigerian-govt","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/sterling-wilson-hits-upper-circuit-after-subsidiary-signs-mou-with-nigerian-govt\/","title":{"rendered":"Sterling &amp; Wilson hits upper circuit after subsidiary signs MoU with Nigerian govt"},"content":{"rendered":"<p>Shares of Sterling and Wilson Renewable Energy NSE 2.42 % hit the upper circuit of 10 per cent at Rs 362.10 in Friday\u2019s trade, its highest level since May 5, after the company&#8217;s wholly-owned step-down subsidiary Sterling and Wilson Solar NSE 2.42 % Solutions signed an MoU with the government of Nigeria.<\/p>\n<p>\u201cWe are pleased to inform that Sterling and Wilson NSE 2.42 % Renewable Energy along with its consortium partner Sun Africa, have signed an MoU with the government of the Federal Republic of Nigeria to deliver the development, design, construction and commissioning of solar photovoltaic power plants with a total installed capacity of 961 MWdc at five different locations in the Federal Republic of Nigeria along with battery energy storage systems with a total installed capacity of 455 MWh,\u201d said Sterling and Wilson in BSE filing.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shares of Sterling and Wilson Renewable Energy NSE 2.42 % hit the upper circuit of 10 per cent at Rs 362.10 in Friday\u2019s trade, its highest level since May 5, after the company&#8217;s wholly-owned step-down subsidiary Sterling and Wilson Solar NSE 2.42 % Solutions signed an MoU with the government of Nigeria. \u201cWe are pleased to inform that Sterling and Wilson NSE 2.42 % Renewable Energy along with its consortium partner Sun Africa, have signed an MoU with the government of the Federal Republic of Nigeria to deliver the development, design, construction and commissioning of solar photovoltaic power plants with [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,239,136],"tags":[],"class_list":["post-524576","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/524576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=524576"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/524576\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=524576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=524576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=524576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}