{"id":521594,"date":"2022-09-13T11:00:00","date_gmt":"2022-09-13T05:30:00","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=521594"},"modified":"2022-09-13T12:32:55","modified_gmt":"2022-09-13T07:02:55","slug":"india-may-need-up-to-28w-of-additional-coal-based-power-generation-capacity-by-2032","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/india-may-need-up-to-28w-of-additional-coal-based-power-generation-capacity-by-2032\/","title":{"rendered":"\u2018India may need up to 28W of additional coal-based power generation capacity by 2032\u2019"},"content":{"rendered":"<p>India may need additional up to 28GW of coal-fired power generation capacity by 2032 apart from the 25GW thermal projects that are under construction, said a report by advisory body Central Electricity Authority (CEA). <\/p>\n<p>&#8220;It is seen that apart from under construction coal-based capacity of 25GW, the additional coal-based capacity required till 2031-32 may vary from 17 GW to around 28 GW,&#8221; CEA said in a draft national electricity plan. <\/p>\n<p>The CEA has put up the &#8216;Draft National Electricity Plan (Vol-I Generation)&#8217; for feedback of stakeholders on September 8, 2022. <\/p>\n<p>As per the Electricity Act, 2003, CEA has to prepare the National Electricity Plan once in five years. The Act stipulates that CEA, while preparing the National Electricity Plan (NEP),<\/p>\n","protected":false},"excerpt":{"rendered":"<p>India may need additional up to 28GW of coal-fired power generation capacity by 2032 apart from the 25GW thermal projects that are under construction, said a report by advisory body Central Electricity Authority (CEA). &#8220;It is seen that apart from under construction coal-based capacity of 25GW, the additional coal-based capacity required till 2031-32 may vary from 17 GW to around 28 GW,&#8221; CEA said in a draft national electricity plan. The CEA has put up the &#8216;Draft National Electricity Plan (Vol-I Generation)&#8217; for feedback of stakeholders on September 8, 2022. As per the Electricity Act, 2003, CEA has to prepare [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,244,144],"tags":[],"class_list":["post-521594","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-power-the-pioneer","category-the-pioneer"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/521594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=521594"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/521594\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=521594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=521594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=521594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}