{"id":521416,"date":"2022-09-13T10:01:13","date_gmt":"2022-09-13T04:31:13","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=521416"},"modified":"2022-09-13T11:16:10","modified_gmt":"2022-09-13T05:46:10","slug":"india-may-need-up-to-28gw-of-additional-coal-based-power-generation-capacity-by-2032-central-electricity-authority","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/india-may-need-up-to-28gw-of-additional-coal-based-power-generation-capacity-by-2032-central-electricity-authority\/","title":{"rendered":"India may need up to 28GW of additional coal-based power generation capacity by 2032: Central Electricity Authority"},"content":{"rendered":"<p>India may need additional up to 28GW of coal-fired power generation capacity by 2032 apart from the 25GW thermal projects that are under construction, said a report by advisory body Central Electricity Authority (CEA).<\/p>\n<p>\u201cIt is seen that apart from under construction coal-based capacity of 25GW, the additional coal-based capacity required till 2031-32 may vary from 17 GW to around 28 GW,\u201d CEA said in a draft national electricity plan.<\/p>\n<p>The CEA has put up the \u2018Draft National Electricity Plan (Vol-I Generation)\u2019 for feedback of stakeholders on September 8, 2022.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>India may need additional up to 28GW of coal-fired power generation capacity by 2032 apart from the 25GW thermal projects that are under construction, said a report by advisory body Central Electricity Authority (CEA). \u201cIt is seen that apart from under construction coal-based capacity of 25GW, the additional coal-based capacity required till 2031-32 may vary from 17 GW to around 28 GW,\u201d CEA said in a draft national electricity plan. The CEA has put up the \u2018Draft National Electricity Plan (Vol-I Generation)\u2019 for feedback of stakeholders on September 8, 2022.<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130],"tags":[],"class_list":["post-521416","post","type-post","status-publish","format-standard","hentry","category-newspapers"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/521416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=521416"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/521416\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=521416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=521416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=521416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}