{"id":517336,"date":"2022-08-27T12:10:59","date_gmt":"2022-08-27T06:40:59","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=517336"},"modified":"2022-08-27T12:10:59","modified_gmt":"2022-08-27T06:40:59","slug":"work-of-laying-tracks-for-underground-tunnel-begins-maha-metro","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/work-of-laying-tracks-for-underground-tunnel-begins-maha-metro\/","title":{"rendered":"Work of laying tracks for underground tunnel begins: Maha-Metro"},"content":{"rendered":"<p>The Maharashtra Metro Rail Corporation Limited (Maha-Metro) on Friday started laying tracks in the underground metro tunnel. Along with laying metro tracks, Maha-Metro is simultaneously installing electric lines and a signal system, said officials.<\/p>\n<p>The underground stretch starts from Range Hills and ends at Swargate.<\/p>\n<p>Brijesh Dixit, managing director, Maha-Metro, said, \u201cMaha-Metro has started the cable laying work and installing signalling system in the underground stretch. The work should be completed in the next few months and later we will conduct a test drive of the underground stretch.\u201d<\/p>\n<p>Hemant Sonawane, public relations officer Maha-Metro, said, \u201cWe had completed tunnel work in June.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Maharashtra Metro Rail Corporation Limited (Maha-Metro) on Friday started laying tracks in the underground metro tunnel. Along with laying metro tracks, Maha-Metro is simultaneously installing electric lines and a signal system, said officials. The underground stretch starts from Range Hills and ends at Swargate. Brijesh Dixit, managing director, Maha-Metro, said, \u201cMaha-Metro has started the cable laying work and installing signalling system in the underground stretch. The work should be completed in the next few months and later we will conduct a test drive of the underground stretch.\u201d Hemant Sonawane, public relations officer Maha-Metro, said, \u201cWe had completed tunnel work [&hellip;]<\/p>\n","protected":false},"author":44,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[141,130,257],"tags":[],"class_list":["post-517336","post","type-post","status-publish","format-standard","hentry","category-hindustantimes","category-newspapers","category-railways-hindustantimes"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/517336","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=517336"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/517336\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=517336"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=517336"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=517336"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}