{"id":516229,"date":"2022-08-23T12:06:10","date_gmt":"2022-08-23T06:36:10","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=516229"},"modified":"2022-08-23T12:06:10","modified_gmt":"2022-08-23T06:36:10","slug":"railway-ministry-rejects-delhi-varanasi-bullet-trains-feasibility-report","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/railway-ministry-rejects-delhi-varanasi-bullet-trains-feasibility-report\/","title":{"rendered":"Railway ministry rejects Delhi-Varanasi bullet train\u2019s feasibility report"},"content":{"rendered":"<p>The railway ministry on Monday rejected the proposed Delhi-Varanasi bullet train\u2019s feasibility report, officials said.<\/p>\n<p>The officials said the multiple curves along the route between Delhi and Varanasi will not allow the high-speed train to run at its speed.<\/p>\n<p>\u201cThe feasibility report proposed by the National High Speed Rail Corporation Limited (NHSRCL) stated that the corridor be built along National Highway-2 citing that this will help in the acquisition of land at cheaper rates and reduce the cost of construction,\u201d a railways official said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The railway ministry on Monday rejected the proposed Delhi-Varanasi bullet train\u2019s feasibility report, officials said. The officials said the multiple curves along the route between Delhi and Varanasi will not allow the high-speed train to run at its speed. \u201cThe feasibility report proposed by the National High Speed Rail Corporation Limited (NHSRCL) stated that the corridor be built along National Highway-2 citing that this will help in the acquisition of land at cheaper rates and reduce the cost of construction,\u201d a railways official said.<\/p>\n","protected":false},"author":44,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[141,130,257],"tags":[],"class_list":["post-516229","post","type-post","status-publish","format-standard","hentry","category-hindustantimes","category-newspapers","category-railways-hindustantimes"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/516229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=516229"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/516229\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=516229"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=516229"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=516229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}