{"id":489598,"date":"2022-05-06T10:44:05","date_gmt":"2022-05-06T05:14:05","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=489598"},"modified":"2022-05-06T10:44:05","modified_gmt":"2022-05-06T05:14:05","slug":"railways-floats-rs-30k-cr-tender-for-800-electric-train-engines","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/railways-floats-rs-30k-cr-tender-for-800-electric-train-engines\/","title":{"rendered":"Railways floats Rs 30k cr tender for 800 electric train engines"},"content":{"rendered":"<p>The Indian Railways has invited bids for the manufacture and supply of 800 electric train engines under a contract worth about \u20b930,000 crore.<\/p>\n<p>These 12,000-horsepower (HP) electric locomotives are to be supplied over the next 10 years and will be manufactured at Banaras Locomotive Works, Varanasi.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Indian Railways has invited bids for the manufacture and supply of 800 electric train engines under a contract worth about \u20b930,000 crore. These 12,000-horsepower (HP) electric locomotives are to be supplied over the next 10 years and will be manufactured at Banaras Locomotive Works, Varanasi.<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,258,136],"tags":[],"class_list":["post-489598","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-railways-the-economic-times","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/489598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=489598"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/489598\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=489598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=489598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=489598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}