{"id":489502,"date":"2022-05-05T17:29:19","date_gmt":"2022-05-05T11:59:19","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=489502"},"modified":"2022-05-05T17:29:19","modified_gmt":"2022-05-05T11:59:19","slug":"lt-construction-to-build-part-of-mumbai-ahmedabad-bullet-train-track","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/lt-construction-to-build-part-of-mumbai-ahmedabad-bullet-train-track\/","title":{"rendered":"L&amp;T Construction to build part of Mumbai-Ahmedabad bullet train track"},"content":{"rendered":"<p>L&amp;T on Thursday said its construction arm has won a large contract for the bullet train project.<\/p>\n<p>L&amp;T Construction has bagged the project from National High-Speed Rail Corporation Ltd (NHSRCL).<\/p>\n<p>&#8220;The railways business of L&amp;T Construction has secured acontract from NHSRCL to construct 116 route km of High-Speed ballastless track works for Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, popularly referred to as the bullet train project,&#8221; the company said in a statement.<\/p>\n<p>Upon completion, this slab track system will enable trains to travel at a speed of up to 320 kilometers per hour.<\/p>\n<p>A ballastless track or slab track is a type of railway track infrastructure in which the traditional elastic combination of ties\/sleepers and ballast is replaced by a rigid construction of concrete or asphalt.<\/p>\n<p>The scope of work includes design, supply, construction and testing and commissioning track works on a design-build lump sum price basis for the double line high speed railway between Vadodara and Sabarmati in Gujarat.<\/p>\n<p>As per the company, a contract valued at Rs 2,500-5,000 crore is a large order.<\/p>\n<p>Japanese Shinkansen track technology will be adopted in this project.<\/p>\n<p>At present, the company is executing various ballastless track projects in multiple metro projects in India and overseas.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>L&amp;T on Thursday said its construction arm has won a large contract for the bullet train project. L&amp;T Construction has bagged the project from National High-Speed Rail Corporation Ltd (NHSRCL). &#8220;The railways business of L&amp;T Construction has secured acontract from NHSRCL to construct 116 route km of High-Speed ballastless track works for Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, popularly referred to as the bullet train project,&#8221; the company said in a statement. Upon completion, this slab track system will enable trains to travel at a speed of up to 320 kilometers per hour. A ballastless track or slab track is a [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[255],"tags":[],"class_list":["post-489502","post","type-post","status-publish","format-standard","hentry","category-railways"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/489502","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=489502"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/489502\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=489502"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=489502"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=489502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}