{"id":487842,"date":"2022-04-29T12:11:12","date_gmt":"2022-04-29T06:41:12","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=487842"},"modified":"2022-04-29T12:11:12","modified_gmt":"2022-04-29T06:41:12","slug":"bengalurus-rwf-set-to-supply-axles-for-train-18-indias-fastest-train","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/bengalurus-rwf-set-to-supply-axles-for-train-18-indias-fastest-train\/","title":{"rendered":"Bengaluru&#8217;s RWF set to supply axles for Train 18, India&#8217;s fastest train"},"content":{"rendered":"<p>BENGALURU: The ongoing Russia-Ukraine crisis has ensured that the Rail Wheel Factory (RWF) got an opportunity to ready axles for the first time for the prestigious Vande Bharat Express (Train 18). The Yelahanka-based concern which caters to the requirements of Indian Railways is set to despatch a total of 136 axles for Train 18, India&#8217;s fastest train.<\/p>\n<p>Train 18 is a semi high-speed train with GPS system operated by Indian Railways under the `Make in India&#8217; initiative. It touched a speed of 180 km\/hr during tests but the maximum during commercial runs is 160 kmph. It is only manufactured at Integral Coach Factory at Perambur in Chennai and presently runs only on two routes: New Delhi to Shri Mata Vaishno Devi Katra and New Delhi to Varanasi.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BENGALURU: The ongoing Russia-Ukraine crisis has ensured that the Rail Wheel Factory (RWF) got an opportunity to ready axles for the first time for the prestigious Vande Bharat Express (Train 18). The Yelahanka-based concern which caters to the requirements of Indian Railways is set to despatch a total of 136 axles for Train 18, India&#8217;s fastest train. Train 18 is a semi high-speed train with GPS system operated by Indian Railways under the `Make in India&#8217; initiative. It touched a speed of 180 km\/hr during tests but the maximum during commercial runs is 160 kmph. It is only manufactured at [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,267,143],"tags":[],"class_list":["post-487842","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-railways-the-new-indian-express","category-the-new-indian-express"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/487842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=487842"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/487842\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=487842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=487842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=487842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}