{"id":482658,"date":"2022-04-06T10:58:58","date_gmt":"2022-04-06T05:28:58","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=482658"},"modified":"2022-04-06T10:58:58","modified_gmt":"2022-04-06T05:28:58","slug":"another-indian-railways-engineering-marvel-in-progress-watch-glimpses-of-worlds-highest-railway-arch-bridge","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/another-indian-railways-engineering-marvel-in-progress-watch-glimpses-of-worlds-highest-railway-arch-bridge\/","title":{"rendered":"Another Indian Railways engineering marvel in progress! Watch glimpses of world\u2019s highest Railway Arch Bridge"},"content":{"rendered":"<p>With the commencement of the world\u2019s highest Railway Arch Bridge, Indian Railways is all set to witness another engineering marvel! Work on the world\u2019s highest Railway Arch Bridge over Chenab River is going in full swing. Once the project is fully completed, the 1,315 metres long bridge over the river Chenab, will stand at 359 metres above the level of the river bed, making it the highest railway bridge in the world. Recently, The Railway Ministry has recently shared the progress of the Arch Bridge on its Twitter handle. Here, watch the glimpses of the progress of the world\u2019s highest Indian Railways Arch Bridge over the Chenab river:<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With the commencement of the world\u2019s highest Railway Arch Bridge, Indian Railways is all set to witness another engineering marvel! Work on the world\u2019s highest Railway Arch Bridge over Chenab River is going in full swing. Once the project is fully completed, the 1,315 metres long bridge over the river Chenab, will stand at 359 metres above the level of the river bed, making it the highest railway bridge in the world. Recently, The Railway Ministry has recently shared the progress of the Arch Bridge on its Twitter handle. Here, watch the glimpses of the progress of the world\u2019s highest [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,264,138],"tags":[],"class_list":["post-482658","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-railways-the-financial-express","category-the-financial-express"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/482658","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=482658"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/482658\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=482658"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=482658"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=482658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}