{"id":480225,"date":"2022-03-30T11:14:34","date_gmt":"2022-03-30T05:44:34","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=480225"},"modified":"2022-03-30T11:14:34","modified_gmt":"2022-03-30T05:44:34","slug":"additional-delhi-metro-interchange-station-inaugurated-at-punjabi-bagh-connecting-green-and-pink-lines","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/additional-delhi-metro-interchange-station-inaugurated-at-punjabi-bagh-connecting-green-and-pink-lines\/","title":{"rendered":"Additional Delhi Metro interchange station inaugurated at Punjabi Bagh, connecting Green and Pink Lines"},"content":{"rendered":"<p>Today, the newly constructed additional interchange station on Delhi Metro\u2019s Green Line has been inaugurated by Mangu Singh, Managing Director, DMRC. This interchange station will provide interconnectivity between Green Line (corridor connecting Brig. Hoshiar Singh to Inderlok\/Kirti Nagar) and Pink Line (corridor connecting Majlis Park to Shiv Vihar) at the Punjabi Bagh West Metro station. According to DMRC, at this metro station, the platforms for both up and down movement have been built in steel and are situated right above the Punjabi Bagh roundabout. The viaduct on Green Line has been modified to install these pre-fabricated steel platforms. The platforms have come up between the Green Line\u2019s Shivaji Park and Punjabi Bagh metro stations.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Today, the newly constructed additional interchange station on Delhi Metro\u2019s Green Line has been inaugurated by Mangu Singh, Managing Director, DMRC. This interchange station will provide interconnectivity between Green Line (corridor connecting Brig. Hoshiar Singh to Inderlok\/Kirti Nagar) and Pink Line (corridor connecting Majlis Park to Shiv Vihar) at the Punjabi Bagh West Metro station. According to DMRC, at this metro station, the platforms for both up and down movement have been built in steel and are situated right above the Punjabi Bagh roundabout. The viaduct on Green Line has been modified to install these pre-fabricated steel platforms. The platforms [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,264,138],"tags":[],"class_list":["post-480225","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-railways-the-financial-express","category-the-financial-express"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/480225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=480225"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/480225\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=480225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=480225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=480225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}