{"id":4776,"date":"2015-03-05T11:51:45","date_gmt":"2015-03-05T11:51:45","guid":{"rendered":"http:\/\/infralive.com\/web\/?p=4776"},"modified":"2015-03-05T11:51:45","modified_gmt":"2015-03-05T11:51:45","slug":"ntpc-commissions-fifth-unit-of-barh-thermal-project-in-bihar","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/ntpc-commissions-fifth-unit-of-barh-thermal-project-in-bihar\/","title":{"rendered":"NTPC commissions fifth unit of Barh thermal project in Bihar"},"content":{"rendered":"<p>NEW DELHI: State-run NTPC today said it has commissioned the fifth unit of its Barh thermal power project in Bihar. &#8220;Unit V of 660 MW of Barh project has been commissioned,&#8221; NTPC said in a regulatory filing to the stock exchange. <\/p>\n<p>The company said, &#8220;With this, the total installed capacity of Barh-II has become 1,320 MW.&#8221; <\/p>\n<p>The total installed capacity of NTPC also rose to 43,803 MW, comprising of 39 NTPC Stations (17 coal-based, 7 combined cycle gas\/liquid fuel based), 7 joint venture and 8 renewable energy projects. <\/p>\n<p>Shares of NTPC were trading at Rs 156.30, down 0.73 per cent on the BSE.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW DELHI: State-run NTPC today said it has commissioned the fifth unit of its Barh thermal power project in Bihar. &#8220;Unit V of 660 MW of Barh project has been commissioned,&#8221; NTPC said in a regulatory filing to the stock exchange. The company said, &#8220;With this, the total installed capacity of Barh-II has become 1,320 MW.&#8221; The total installed capacity of NTPC also rose to 43,803 MW, comprising of 39 NTPC Stations (17 coal-based, 7 combined cycle gas\/liquid fuel based), 7 joint venture and 8 renewable energy projects. Shares of NTPC were trading at Rs 156.30, down 0.73 per cent [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[132],"tags":[],"class_list":["post-4776","post","type-post","status-publish","format-standard","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/4776","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=4776"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/4776\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=4776"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=4776"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=4776"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}