{"id":473440,"date":"2022-03-05T11:39:38","date_gmt":"2022-03-05T06:09:38","guid":{"rendered":"https:\/\/infralive.com\/web\/?p=473440"},"modified":"2022-03-05T12:47:41","modified_gmt":"2022-03-05T07:17:41","slug":"tallah-bridge-set-to-miss-april-deadline","status":"publish","type":"post","link":"https:\/\/infralive.com\/web\/tallah-bridge-set-to-miss-april-deadline\/","title":{"rendered":"Tallah bridge set to miss April deadline"},"content":{"rendered":"<p>The new Tallah bridge is far from ready and PWD engineers overseeing the project said the structure is unlikely to be opened before June-end.<\/p>\n<p>Officials had earlier said the new bridge would be opened in April. <\/p>\n<p>Engineers supervising the Rs 350-crore project in north Kolkata said only about 40 per cent of the work over railway tracks was over. <\/p>\n<p>\u201cA lot remains to be done before a 240m-long span over the tracks is covered with concrete deck slabs,\u201d said an engineer.<\/p>\n<p>Also, the construction of the two approach roads to the bridge \u2014 one from the Shyambazar-end and the other from the Paikpara-end \u2014 has not yet started.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The new Tallah bridge is far from ready and PWD engineers overseeing the project said the structure is unlikely to be opened before June-end. Officials had earlier said the new bridge would be opened in April. Engineers supervising the Rs 350-crore project in north Kolkata said only about 40 per cent of the work over railway tracks was over. \u201cA lot remains to be done before a 240m-long span over the tracks is covered with concrete deck slabs,\u201d said an engineer. Also, the construction of the two approach roads to the bridge \u2014 one from the Shyambazar-end and the other [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[130,218,148],"tags":[],"class_list":["post-473440","post","type-post","status-publish","format-standard","hentry","category-newspapers","category-roads-the-telegraph","category-the-telegraph"],"acf":[],"_links":{"self":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/473440","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/comments?post=473440"}],"version-history":[{"count":0,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/posts\/473440\/revisions"}],"wp:attachment":[{"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/media?parent=473440"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/categories?post=473440"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infralive.com\/web\/wp-json\/wp\/v2\/tags?post=473440"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}